The Rothen Group were asked by Canal & River Trust to assist with designing and building a new replacement timber lift bridge on the Oxford Canal.

The Project
Managing access through a leisure centre and school
No historical build information available
Restoring and re-using the lift bridge mechanisms and metal work
Removal and disposal of the exisiting timber bridge
Producing CAD drawings of new bridge
Supply of ‘kit form’ bridge parts made of heritage oak to be assembled on site
Refitting metal to new bridge
Installing new bridge in situ, including lift mechanism
We sent out our CAD designer to measure the existing bridge and work with the Canal & River Trust Heritage Advisor to incorporate the correct construction methods into the drawing and subsequently the build.There was limited access to the site so we had to time the works around the school and leisure centre and work to a tight programme as the school required access via the bridge.
We had to use a tracked excavator for the lifting operations and our construction team lifted off the old bridge, constructed the new bridge and lifted it into position in a 3-day window. These works were undertaken with minimal supervision and to a high standard, in conjunction with our pragmatic approach to these type of projects.


FEATURED CASE STUDY
Habitat Creation Coney Meadows, Droitwich
Coney Meadows is part of a nationwide project to restore the UK’s wetlands. Since the 17th century, large areas of reedbeds have been stripped and converted into agricultural land, massively reducing the number of habitats available for wetland animals.

FEATURED CASE STUDY
Changing the Shape of the River Derwent, Derby
Following the storm seasons of 2023 & 2024, the EA set out to review its impact on the UK’s waterways. The River Derwent in Derby was flagged after a sonar scan of its navigation identified a scour hole – a direct result of heavy rainfall pushing sediment downstream.
Our Accreditations