FEATURED CASE STUDY
Habitat Creation Coney Meadows, Droitwich
Coney Meadows is part of a nationwide project to restore the UK’s wetlands. Since the 17th century, large areas of reedbeds have been stripped and converted into agricultural land, massively reducing the number of habitats available for wetland animals.

FEATURED CASE STUDY
Changing the Shape of the River Derwent, Derby
Following the storm seasons of 2023 & 2024, the EA set out to review its impact on the UK’s waterways. The River Derwent in Derby was flagged after a sonar scan of its navigation identified a scour hole – a direct result of heavy rainfall pushing sediment downstream.
All case studies
Our Work: Habitat Creation Coney Meadows, Droitwich
Site: Coney Meadows, Droitwich Date: January – March 2025 Introduction Restoring reedbeds and raising the water table to create new...
Our Work: Changing the Shape of the River Derwent, Derby
Site: River Derwent, Derby Date: August 2024 Introduction Following the storm seasons of 2023 & 2024, the EA set out to review its...
Our Work: Gayton Marina Swing Bridgeworks
Site: Gayton Marina Swing Bridge Date: July 2023 Introduction Our client, ABC Leisure Group , run 21 marinas nationwide. The access...
Our Work: Bridge 238, Oxford Canal
Site: Bridge 238, Oxford Canal Date: March 2023 Introduction The Rothen Group were asked by Canal & River Trust to assist with...
Our Work: Invasive Species Removal & Management River Colne & River Stort
Site: Invasive Species Removal & Management Date: Since April 2019 to date Introduction The Rothen Group have worked with Canal &...
Our Work: London & South East: composting of floating weed & floating invasive species
Site: London & South east: composting of floating weed & floating invasive species Date: Since April 2019 to date The Rothen Group ...
Our Work: Habitat Creation Works
Water vole habitat Proposed piling works had ceased due to the presence of water voles on the bank to be impacted and a lack of habitat...
Our Work: Trent Valley – Shardlow & Willington
Site: Trent Valley – Shardlow & Willington Date: November 2020 – February 2021 Value : £150,000 Introduction The Rothen Group were...
Our Work: London Aquatic Weed Clearance
Site: Central London Date: April 2019 – October 2019, April 2020 – October 2020 Value : £300,000 Introduction The Rothen Group were...
Our Work: Ashby Towpath, Hinckley
Site: Ashby Towpath, Hinckley Date: July 2020 Value : £30k Introduction The Rothen Group were asked by Canal & River Trust to assist...
Our Work: Different Options for Bank Protection in Greenford Green, London
Piling to water level with concrete coping The Rothen Group were approached by Galldris Construction Ltd at the ECI stage to deliver the...
Our Work: Hemingford Lock Landing
Site: Hemingford Lock Landing Date: January 2020 to May 2020 Value : £275,000 Introduction The Rothen Group were asked by JN Bentley...
Our Work: Chesterfield Rock Roll & Mattress
Site: Chesterfield Date: February – March 2020 Value : £50k Introduction The Rothen Group were asked by Canal & River Trust to...
Our Work: Greeberfields, Skipton
Site: Greeberfields, Skipton Date: January – February 2020 Value: £35k Introduction The Rothen Group were asked by Canal & River Trust,...
Our Work: River Nene & River Great Ouse
Site: River Nene & River Great Ouse Date: Winter 2018-19 Value: £250,000 Introduction The Rothen Group were asked by JN Bentley and the...
Our Work: Marbury Embankment
Site: Marbury Embankment Date: June – July 2019 Value: £100,000 Introduction The Rothen Group were asked by Canal & River Trust and...
Our Work: South Level Patch Piling; River Cam
Site: South Level Patch Piling; River Cam Date: January 2018 – March 2018 & February 2019 to May 2019 Value: £400,000 Introduction The...
Our Work: Macclesfield Canal
Site: Various locations along Macclesfield Canal Date: January to March 2018 Value: £135,000 Introduction The Rothen Group were asked...
Our Work: Glaxo Smith Klein, Greenford Green, London
Site: Glaxo Smith Klein Factory Site, Greenford Green, London Date: September 2018 – February 2019 Value: £450,000 Introduction The...
“The Rothen Group’s knowledge has ensured that potential issues were highlighted early, meaning projects run smoothly and on programme. They have a large fleet of plant and operators too, which reassures that the work will be completed safely and with due care.”
Martin Dean
JN Bentley
“The Rothen Group have worked with us and supplied marine, piling and fencing plant for many years. The team have excellent working knowledge of the UK canal system.”
Jim Walton
CPC Civils
“The works were completed to a high standard of quality both ahead of programme and in a safe manner. All parties were really pleased with how smooth the construction phase went.”
Andrew Smith
Mott MacDonald Bentley
“Your crew worked seamlessly to deliver both the headwall and gabion basket lifts safely and efficiently. Their approach to safety, teamwork, and communication made a real difference and helped keep everything on track.”
Adam De'Ath
Canal & River Trust
"The professionalism, communication and quality of the works delivered by The Rothen Group has been exceptional! From the project initiation phase to delivering the hard work on the ground they have been an outstanding contractor to work with."
Charles Hughes
Canal & River Trust
Who we collaborate with
Case Studies
Click on the map to view examples of the solutions we’ve created to gain more insight into the expertise and quality of work you can expect from The Rothen Group.