Gayton Marina Swing Bridgeworks

Site:

Gayton Marina Swing Bridgeworks

Date:

July 2023

Value:

Our client, ABC Leisure Group, run 21 marinas nationwide. The access road bridge at Gayton Marina had failed, meaning the marina was inaccessible and users had nowhere to park. We needed to provide a fix with a quick turnaround.

The Project

  • Lift out and inspect bridge

  • Transport bridge to our wharf

  • Refurbish bridge including shot blasting and painting

  • Replaced timber handrails for metal

  • Renewed the swing bearing system and installed a new heavier duty hydraulic RAM

  • Counter balanced the bridge

  • Deliver and refit refurbished bridge

Our engineers visited site and it was decided that it was more time and cost effective to refurbish the bridge than rebuild new. Access was restricted to a single track road so we had to utilise over the front hiab lorries for the lifting operation. The bridge was lifted out and returned to our wharf where it was shot-blasted, repainted and the timber handrails replaced with metal.


Our workshop team also fitted an auto lube grease system to the bearings to reduce annual maintenance, demonstrating their innovative approach. The bridge was lifted back into position and inspected to ensure it was fully operational.

dredging-coney-meadows.jpg

FEATURED CASE STUDY

Habitat Creation Coney Meadows, Droitwich

Coney Meadows is part of a nationwide project to restore the UK’s wetlands. Since the 17th century, large areas of reedbeds have been stripped and converted into agricultural land, massively reducing the number of habitats available for wetland animals.

River-derwent-clearing.jpg

FEATURED CASE STUDY

Changing the Shape of the River Derwent, Derby

Following the storm seasons of 2023 & 2024, the EA set out to review its impact on the UK’s waterways. The River Derwent in Derby was flagged after a sonar scan of its navigation identified a scour hole – a direct result of heavy rainfall pushing sediment downstream.

case-study-eg.webp

FEATURED CASE STUDY

Glaxo Smith Klein 
Factory Site,
Greenford Green, 
London

The Rothen Group were approached by Galldris Construction Ltd at the ECI stage to deliver the marine elements of their ambitious redevelopment works to the Glaxo Smith Klein factory site in Greenford Green, London.

Our Accreditations

bottom of page