top of page

Greeberfields Skipton

Site:

Greeberfields Skipton

Date:

January - February 2020

Value:

The Rothen Group were asked by Canal & River Trust, Kier & JJF to assist with a bank slippage long the canal in Skipton. A 30m stretch of canal bank had slipped into the canal causing an obstruction and blocking the canal to navigation.

The Project


  • Understanding access restrictions

  • Time constraints

  • Clearing the obstruction

  • Creating a stable stone foundation

  • Installing the gabion baskets

  • Finishing the site & clearing the site compound

Using one of our marine ready excavators with a long reach arm and clamshell, the obstruction could be removed, before a new stone foundation was put in place ready for construction of the new bank. Through undertaking the works with a clamshell grab, there was no need to dewater the canal, not only saving time & cost but also reducing the impact on fish stocks.


This took the form of gabion baskets which had to be stacked at a slight angle, before being filled & tied together to create a solid bank. Our experienced team worked to get this form of erosion control in place effectively and timely to see the canal opened earlier than anticipated. This form of bank protection can provide shelter for fish fry & invertebrates below the water & a range of insects, animals and plants above the water which is ideal for this more rural setting.

dredging-coney-meadows.jpg

FEATURED CASE STUDY

Habitat Creation Coney Meadows, Droitwich

Coney Meadows is part of a nationwide project to restore the UK’s wetlands. Since the 17th century, large areas of reedbeds have been stripped and converted into agricultural land, massively reducing the number of habitats available for wetland animals.

River-derwent-clearing.jpg

FEATURED CASE STUDY

Changing the Shape of the River Derwent, Derby

Following the storm seasons of 2023 & 2024, the EA set out to review its impact on the UK’s waterways. The River Derwent in Derby was flagged after a sonar scan of its navigation identified a scour hole – a direct result of heavy rainfall pushing sediment downstream.

case-study-eg.webp

FEATURED CASE STUDY

Glaxo Smith Klein 
Factory Site,
Greenford Green, 
London

The Rothen Group were approached by Galldris Construction Ltd at the ECI stage to deliver the marine elements of their ambitious redevelopment works to the Glaxo Smith Klein factory site in Greenford Green, London.

Our Accreditations