The Rothen Group were asked by Canal & River Trust to assist with the 

management of weed along 20 miles of London’s waterways for 7months

Green weeds being cleared from canal

The Project

  •  Mobilising and operating up to 6 weed boats with experienced operators

  • Understanding access restrictions, working on busy navigational waterways and liaising with the general public

  • Dealing with invasive species

  • Innovative thinking’ and versatility to generate an effective & efficient standard of work resulting in high productivity

  • Designing our boats to be able to deal with floating weed, thick blankets of weed, submerged weed and marginal reeds

  • Being proactive with working to a set route & plan, but reactive to ‘hotspots’ around the capital

  • Daily and weekly reporting to liaise with CRT and other third parties

  • Alongside this we supplied tugs, hoppers & helmsman to move the collected weed around London ready for disposal.

  • We removed 6600m3 of weed (equivalent to 383 African elephants!) and 400m3 rubbish in 2019

  • In 2020 we have successfully started composting the weed

dredging-coney-meadows.jpg

FEATURED CASE STUDY

Habitat Creation Coney Meadows, Droitwich

Coney Meadows is part of a nationwide project to restore the UK’s wetlands. Since the 17th century, large areas of reedbeds have been stripped and converted into agricultural land, massively reducing the number of habitats available for wetland animals.

River-derwent-clearing.jpg

FEATURED CASE STUDY

Changing the Shape of the River Derwent, Derby

Following the storm seasons of 2023 & 2024, the EA set out to review its impact on the UK’s waterways. The River Derwent in Derby was flagged after a sonar scan of its navigation identified a scour hole – a direct result of heavy rainfall pushing sediment downstream.

case-study-eg.webp

FEATURED CASE STUDY

Glaxo Smith Klein 
Factory Site,
Greenford Green, 
London

The Rothen Group were approached by Galldris Construction Ltd at the ECI stage to deliver the marine elements of their ambitious redevelopment works to the Glaxo Smith Klein factory site in Greenford Green, London.