top of page
Hydraulic Breakers

Hydraulic Breakers

Powerful, Portable, and Built for the Job

CPjcEJ5A.jpeg

Product Description

Built for harsh site conditions, our hydraulic breakers are ideal for asphalt removal, concrete demolition, post-driving, and pile breaking. Whether you're clearing old structures or prepping groundworks, these attachments deliver high-impact performance where you need it most.

KEY FEATURES

  • SD21 – fits 1–3t machines

  • SD22 – fits 3–4.5t machines

  • SD23 – fits 4–6t machines

  • JCB Beaver Pack – petrol-powered, standalone unit

  • Optional post driver attachment 

  • Vibration-damped for safer use

INFORMATION SHEETS

We supply a full range of SD breakers, including:


  • SD21 – ideal for 1–3 tonne machines

  • SD22 – mid-range, for 3–4.5 tonne machines

  • SD23 – high-power option, fits 4–6 tonne excavators


For standalone use, the JCB Beaver Pack offers a modern, portable alternative to traditional pneumatic breakers. Petrol-powered, vibration-damped, and compact, it delivers serious performance with minimal operator fatigue. A detachable 6m hose and optional post driver attachment make it an optimal choice for smaller-scale canal works and restoration jobs.


Need help choosing? Our team can advise on the best tool for your project. Whether you’re breaking concrete, driving posts, or clearing the way for piling, The Rothen Group’s hydraulic breakers are trusted across the inland network.

CPjcEJ5A.jpeg

Gallery

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.

Add paragraph text. Click “Edit Text” to update the font, size and more. To change and reuse text themes, go to Site Styles.

LABEL

VALUE

Specifications

Frequently hired together

The Rothen Group provide a high quality, work boat rental service supplying an array of large and small work boats for narrow beam & wide beam waterways. 

“The Rothen Group’s knowledge has ensured that potential issues were highlighted early, meaning projects run smoothly and on programme. They have a large fleet of plant and operators too, which reassures that the work will be completed safely and with due care.”

Martin Dean

JN Bentley

“The Rothen Group have worked with us and supplied marine, piling and fencing plant for many years. The team have excellent working knowledge of the UK canal system.”

Jim Walton

CPC Civils

“The works were completed to a high standard of quality both ahead of programme and in a safe manner. All parties were really pleased with how smooth the construction phase went.”

Andrew Smith

Mott MacDonald Bentley

“Your crew worked seamlessly to deliver both the headwall and gabion basket lifts safely and efficiently. Their approach to safety, teamwork, and communication made a real difference and helped keep everything on track.”

Adam De'Ath

Canal & River Trust

"The professionalism, communication and quality of the works delivered by The Rothen Group has been exceptional! From the project initiation phase to delivering the hard work on the ground they have been an outstanding contractor to work with."

Charles Hughes

Canal & River Trust

Who we collaborate with

bottom of page